The design for the site calls for a market floor and a green park space to cover most of the existing site. However, to facilitate the unloading and setting up of market stalls, as well as parking, the asphalt on the boundary of the lot opposite of Monroe St will be repaved. Some of the asphalt currently being removed from the existing parking lot will be recycled to make the new parking spaces.
Tuesday, March 1, 2011
Site Preparation Begins
The design for the site calls for a market floor and a green park space to cover most of the existing site. However, to facilitate the unloading and setting up of market stalls, as well as parking, the asphalt on the boundary of the lot opposite of Monroe St will be repaved. Some of the asphalt currently being removed from the existing parking lot will be recycled to make the new parking spaces.
Virginian Review, Saturday February 26th
The Covington Farmer's Market made front page news in the Virginian Review on Saturday. Information on the site preparation was announced to begin on Monday, the 28th of February. The article also explained a bit about the steps taken in the design process and the deconstruction of the tire warehouse in Clifton Forge as well as the repurposing of the tire warehouse's wood.
Friday, February 18, 2011
Public Presentation in Covington



On Wednesday night, design/build lab presented our ideas and designs to the farmers and members of Olde Town Covington, as well as to some of the volunteers for the project.
We also explained the process we will be using to construct. We will be prefabricating the structure of the building, roof, and market floor off-site in a location in Blacksburg. Simultaneously, the ground and foundations for the market space will be prepared in Covington. Once the ground and foundations are ready, the modular pieces constructed in our Blacksburg facility will be transported up to Covington for assembly on-site.
The presentation lead to friendly conversation with those who attended because of the enthusiasm from the farmers and Olde Town Covington.
We also explained the process we will be using to construct. We will be prefabricating the structure of the building, roof, and market floor off-site in a location in Blacksburg. Simultaneously, the ground and foundations for the market space will be prepared in Covington. Once the ground and foundations are ready, the modular pieces constructed in our Blacksburg facility will be transported up to Covington for assembly on-site.
The presentation lead to friendly conversation with those who attended because of the enthusiasm from the farmers and Olde Town Covington.
Sunday, February 13, 2011
Wednesday, February 2, 2011
Tuesday, January 25, 2011
Proposal for Master Plan
This is a proposal for the master plan of the market. This will dictate the general layout of the market, green space, and parking area for the market. We are working mostly off of this arrangement to make a final proposal for the market. Our final design may not be exactly the same in plan, but this master scheme will definitely influence our proposal.Friday, January 21, 2011
Market Proposal: Slabs


A projection of the site’s terrain represented by a series of slabs suspended at varying alignments and heights to form a roof. These thick slabs will be oriented to allow a certain quality of light to penetrate through the roof and into the market space. The aim of this is to exercise the idea that a light and airy space can be created underneath these seemingly heavy slabs.
Subscribe to:
Posts (Atom)



