Friday, April 29, 2011

Building Prefabrication Phase II

The first step after constructing and erecting the three building sections was to apply the plywood to the building. Once the buildings were square and level, the plywood helped us to maintain the square status of the building, while creating an interior and exterior space to each individual room.After the plywood was put on the building, we added tar paper to the exterior in order to help us keep water off and out of the building. Although tar paper is not water tight, it is water resistant and was very helpful in preparing each building for its final exterior material.






With the application of the tar paper on the building finalized, battons were then mounted to the building so that cladding could be added to the exterior.






Using the battons on two walls of each building, the cladding was mounted to the necessary sides using a drill, a screw gun, and when needed, a clamp or ratchet strap. The screws were screwed into each batton to ensure a sturdy exterior rain screen for the building sections. The design for the buildings was to have the wood cladding wrap up and around the entire exterior in one direction so that continuity of the ground plane's direction was maintained. The seams on the buildings will align with the seams in the deck on site.



Once cladding was applied to all of the appropriate walls, any excess was trimmed to create a smooth seam between roof and wall.

Monday, April 25, 2011

Roof Prefabrication Phase II

Joists were placed between each of the trusses that makes up each section. Once all of the josts for the entire truss were framed out, we added battons to the top of the roof section. These battons will be used to add the metal roofing to the structure once the roof sections are placed together on site.



Thanks to the high base space's pully system, we were able to separate and lift the roof sections off of their original supports once completed. Each roof section is approximately 2,700 pounds.


In order to begin working on the ceiling of each roof section, we had to use the pully system to lift and rotate each roof section upside down.


Tar paper was then added to the roof sections to prevent moisture from accumulating inside the section. We used a combination of white pine and repurposed heart pine salvaged from the Tire Warehouse in Clifton Forge to create the market ceiling.


The last step of the process is to apply waterproofing so that the wood would not get wet. Once each roof section was finished we were able to use the same pully system to lower the section onto dollies to move the sections out of the work space. The whole class would then work together to move the trusses out to locations where they could be "parked" until transportation up to Covington.

Saturday, March 26, 2011

Building Prefabrication Phase I

After reusing much of the oak from the Tire Warehouse to make 2x4s, we learned how to lay out walls for building construction, and used the oak as the wall studs.
Using a nail gun, we constructed all of the walls for the bathroom section of the building.

Once each bathroom wall was constructed, we raised them and squared them off to make sure each one was fitting perfectly at 90 degree angles. We braced the building afterwards to maintain the square overnight until we could continue working on the building.

Thursday, March 24, 2011

Site Preparation Phase II

This week the ground began to be prepared for the concrete foundations on site. These pictures, taken Wednesday March 23rd, show the ground excavations for placement, as well as the arrangement of rebar used to strengthen the foundations.


Although they will not be seen in the final product, the foundations are crucial to the construction of the market. They will be used to support the market floor, building and roof.

Wednesday, March 23, 2011

Ground Prefabrication Phase I

When the pressure-treated lumber arrived last week, we began to measure and cut pieces of wood to the sizes we needed for the frames for the market ground.
After they were cut, we began to layout the sections of wood we had cut and mark 90 degree angles so that the framing construction would be square.

Once the pieces were lined up, we held them in place as a nail gun was used to connect each joist to the girder on the exterior.

The final product, one market floor frame. These will be used to support the market floor made of locally grown locust wood.

Monday, March 21, 2011

Roof Prefabrication Phase I

In order to facilitate the easier movement of the trusses in and out of the high-base space after construction, we built dollies. They also helped us to construct a guide for a fixed distance between the dollies on each side.



Once the distance between the two trusses was established, each truss's location was measured and each truss was nailed to the appropriate guide. We then began framing between the two trusses.


Thursday, March 17, 2011

Pre-Construction Phase I

This week, design/build lab moved all of our operations to our off-campus facility where prefabrication will occur. On Monday we discussed logistics and began working towards getting our salvaged materials ready for construction.


We've been working with the wood harvested from the Tire Warehouse in Clifton Forge to cut the timbers down to size for our design.
Because the wood is being reused, there were some nails left over from the original construction. The nails all had to be removed, and the ends of each piece of wood were cut to be square.
The oak seen in these photos will be reused as framing lumber for the building of the market, which includes a restroom, storage facility, and an office for the Market Manager.