In order to transport and install all the roof sections in Covington without breaking the edge boards of the ceiling, the end pieces of the ceilings were removed for installation. This left space between each two roof sections where we needed to repair tar paper ripped in transport, as well as insert and secure the edges of the ceiling.
Thursday, May 26, 2011
Market Ceiling and Lights
In order to transport and install all the roof sections in Covington without breaking the edge boards of the ceiling, the end pieces of the ceilings were removed for installation. This left space between each two roof sections where we needed to repair tar paper ripped in transport, as well as insert and secure the edges of the ceiling.
Sunday, May 22, 2011
Finalizing the Market Floor and Details
We continued to work on the decking of the market to make the floor space usable for the opening market day.
It was difficult to coordinate the lengths of the boards and frames in our pre-fabrication facility, so all of the decking for the building was done on-site. The widths of the floorboards match up with the building's exterior cladding so that the size of wood used for the decking would continue up the side of the building.
Friday, May 20, 2011
Roof Installation Phase II
Design/Build LAB on the news
On Thursday night's WSLS 5:30 news, design/build LAB's farmers market project was featured as one of the local news segments.
Click here to view the video clip.
Click here to view the video clip.
Roof Installation Phase I
Three roof sections were up at the end of the day Wednesday.
Wednesday, May 18, 2011
Market Floor Installation Phase I
The market floor currently stretches Main St. down to just before the building. Some decks will be built in-place on site to ensure proper alignment with the building's slab.
Saturday, May 14, 2011
Ground Prefabrication Phase III